Building Forms

Description: Caption says, "A-820 Building forms for concrete along downstream toe of dam. Concrete was placed upstream of these forms to provide access to the apron and balance of the foundation."
Date: February 4, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Concrete Placing

Description: Caption says. "A-822 View of first concrete placing operations. Concrete is hauled from mixing plant in 2 c. y. bottom-dump buckets and placed by means of a Lima Crane."
Date: February 5, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Concrete Placing

Description: Caption says, "A-821 View of first concrete placing operations looking north from area excavated for the south abutment."
Date: February 5, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Form-Building

Description: Captions says, "A-829 Completion of intermediate training wall footing and apron slab on left face of wall. Form-building is in progress on slab in controlled spillway."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

A-line Grouting

Description: Caption says, "A-826 A-line grouting and drainage nipples set in place along gallery location before covering this portion of foundation with concrete. At right may be seen upstream edge of concrete placed to date."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

New Station Facilities Location

Description: Caption says, "A-832 New location for station facilities and siding for Lugert, Oklahoma. Ballast has been windrowed in preparation to laying track for siding. A.T. & S.F. Railroad Relocation."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Mr. Wesley Holtz

Description: Caption says, "A-835 Mr. Wesley Holtz holding a new vibrator to be tried out on the concrete to be placed in the dam."
Date: March 2, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Spillway Apron

Description: Caption says, "A-838 View of spillway apron from right abutment. Apron is complete except for two panels in foreground. Concrete placing operations proceeding in background on uncontrolled spillway apron adjacent to intermediate training wall."
Date: March 18, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Masonry

Description: Caption says, "A-842 Placing of first masonry on left abutment. Forms for contraction joint under construction."
Date: March 23, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Excavation

Description: Caption says, "A-844 Primary excavation for right training wall. Embankment on right side is truck ramp leading off spillway apron." Hand written at the end of caption is, "Foreground: R. A. McCallum."
Date: March 30, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie