Altus Dam

Description: Caption says, "5-AL-1126. Altus Dam. Reservoir El. 1559.10. First discharge over uncontrolled spillway. Wide-angle lens."
Date: May 22, 1949
Creator: Callan, J. A.
Partner: Museum of the Western Prairie

Altus Dam

Description: Caption says, "5-AL-616. View of Altus Dam with first water flowing over lower spillway. Reservoir elevation 1547.70."
Date: May 12, 1947
Creator: George, P. W.
Partner: Museum of the Western Prairie

Laborers Working on Channel Diversion

Description: Laborers working on diversion channel for Altus Dam project. Caption says, "A-757 View of the completed end of the diversion channel showing construction on the third pier on the temporary bridge. Low water crossing may be seen in the background."
Date: September 30, 1942
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Effect of Water on Dam Foundation

Description: Caption says, "A-813 View of main portion of dam foundation showing effect of wear due to water course before present dam was built. This picture was taken before final cleanup, Altus Dam - Altus Project."
Date: January 22, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Masonry

Description: Caption says, "A-867 Close up view of junction of left abutment and spillway section of dam on May 26, 1943, showing Masonry placing in progress. Note gallery adit arch and Altus city water line in Masonry face. Elevation of Spillway section 1504."
Date: May 26, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Masonry

Description: Caption says, "A-827 First granite masonry placed in Altus Dam. Because of rough rock foundation concrete pedestals were placed to start first course of rubble masonry in upstream face."
Date: February 22, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Cracking and Pitting in Soil Cement

Description: Caption says, "5-AL-76. Altus Dam. View of the right slope of the Main Canal in the test area showing in detail the cracking and pitting in soil cement at splice where 10 per cent and 12 per cent soil cement merge."
Date: December 14, 1945
Creator: Reynolds, R. M.
Partner: Museum of the Western Prairie

Concrete Placing

Description: Caption says, "A-846 View of concrete placing operations taken from right abutment. Note portion of right training wall being placed monolithic with the dam."
Date: March 30, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Concrete Placing

Description: Caption says, "A-824 Placing concrete in large water worn channel in foundation adjacent to downstream toe of the dam."
Date: February 9, 1943
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie