196 Matching Results

Search Results

Bitter Creek Flood

Description: Caption says, "A-410 Bitter Creek Flood. Section line road three-fourths mile east of Bitter Creek Bridge; west of Altus on Highway #62. Cotton field on left, alfalfa field on right. In left background is a stack of newly cut alfalfa hay in flooded area."
Date: October 23, 1941
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Carryall Unit

Description: Caption says, "A-409 Railroad and Highway Relocation. Carryalls on center fill construction on Rock Island Railroad and Highway #9 Relocation. Station 576."
Date: October 21, 1941
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Caterpillar Tractor

Description: Caption says, "A-384 Dikes, North. Caterpillar tractor with bulldozer attachment pulling rolling tamper on backfilling operations in cutoff trench. North Dike, Station 3+50."
Date: October 9, 1941
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Caterpillar Tractor

Description: Caption says, "A-417 Railroad and Highway Relocation. Caterpillar tractor pushing carryall excavation for center fill on Rock Island Railroad and Highway #9. Station 567."
Date: October 28, 1941
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Cement mixer

Description: Cement mixer with laborer operating it. Caption says, "A-733 Interior of mixing plant showing mixer and hopper layout."
Date: October 30, 1942
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Concrete Culvert

Description: Caption says, "A-399 Railroad and Highway Relocation. Santa Fe Railroad - 6' x 5' reinforced concrete culvert at Station 148. Lugert Dike in the background."
Date: October 13, 1941
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Constructing Wire Fence

Description: Caption says, "A-15 Altus Project. Photograph showing the wire fence being constructed around the warehouse and shop building area. Style being used temporarily as means for crossing the woven wire fence on south side of building area."
Date: October 15, 1940
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Construction site

Description: Construction site for the Altus Dam project. Caption says, "A-774 General view showing construction progress of batching and mixing layout."
Date: October 31, 1942
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie

Excavated Rock

Description: Fractured rock shown in diversion channel for the Altus Dam project. Caption says, "A-726 Condition of foundation rock in the area excavated for diversion channel and canal outlet works. Fractured rock as shown existed only in a small area."
Date: October 1, 1942
Creator: Breitenstein, Frank C.
Partner: Museum of the Western Prairie
Back to Top of Screen